Drilling and producing offshore

Drilling and producing offshore

4.11 - 1251 ratings - Source



Of the four ram preventers, the blind shear usually is placed just below the annular preventer or is positioned so there is one pipe ram between it and the annular preventer. ... The lower, middle, and upper support frames are flanged and bolted to four large guide posts through which guidelines are run. ... Shaffer and Hydril rams have an automatic lock incorporated in their operating mechanisms.


Title:Drilling and producing offshore
Author: R. Stewart Hall
Publisher:Pennwell Corp - 1983
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA